Shore Construction & Testing Exercise
March 6, 2003

previous | next | home
(16 of 18)

North side looking south at posts SE, and SC. Load has been reduced to approximately 9-tons. Note the compression of the 2x4 over the SE (left) post. Normally header would not include a 2X4 inch cap. This was done in order to use available lumber.

North side looking south at posts SE, and SC. Load has been reduced to approximately 9-tons. Note the compression of the 2"x4" over the SE (left) post. Normally the header would not include a 2"x4" cap. This was done in order to use the available lumber.